Turkish Petroleum A.O. Underground Storage of Natural Gas in North Marmara & Degirmenkoy Gas Fields Extension Project ( Phase II)
Natural Gas Metering Facilities • Glycol And Knock-out Drum Tanks • Teg Generation • Teg Contactor And Filter Seperator Systems • Hot Flare And Cold Flare Engineering And Construction • Gas Heater Systems • Compressed Air Systems • Anti-corrosion Methanol Injection Systems • Natural Gas Automation Building • Hot Tap Operation 20 Inch 2km Botas Pipe Line • Fire Detection And Extinguishing Systems • Heat Tracing • Gas Detection Systems • Ex-proof Electrical Panels • 1000 Kva Natural Gas Generator Instalation
-
Restoration of Bursa - NATO Pipeline - BURSA MUNICIPALITY
Bursa Metro System Phase 3 East end Stations - Ballıdere Section 4+350 km NATO Pipeline Displacement and Revision
-
Restoration of Eastern-Anatolia NATO Pipeline
Eastern Anotolia Pipeline Displacement and Revision. Solhan Bingöl Dual Carriageway horizontal boring
-
Erhaç Airfield Jet- Fuel Facilities - NATO
Emergency Generator • Jet Fuel Storage and Distribution Facilities • Mechanical and Electrical Distribution Systems • 1.250m3 Storage Tank and Pump Building • Two Truck Loading Systems • Drainage Tank Restoration • 75 kva Spare Generator • Lightening Protection Systems
-
Bandırma Airfield Hydrant Project - NATO
Airfield Hydrant and Water Pump Systems with 17 km Pipeline
-
Konya Airfield Jet- Fuel Facilities- NATO
Emergency Generator • Jet Fuel Storage and Distribution Facilities • Mechanical and Electrical Distribution Systems • 1.250m3 Storage Tank and Pump Building • Two Truck Loading Systems • Drainage Tank Restoration • 75 kva Spare Generator • Lightening Protection Systems
-
Incirlik Airfield Manifold And Filter System Restoration- United States Airforce Division
Manifold and Filter System Restorations For Jet Fuel, 2 x 240 m3 Water Seperators Together With Automatic And Hydrolic Control Valves and Related Mechanical and Electrical Equipment
-
South East Turkey Pipeline Restoration - NATO
South East Turkey Pipeline Restoration
-
Incirlik Airfield Aircraft Shelters Renovation - NATO
Protected Air Craft Shelters,16.380 m2 Epoxy Coating And Stainless Steel Pipeline • Hot Re-fueling Facility Together With Pantograph For Military Aircrafts
-
Afyon Military Airfield For F16 – NATO
This Projected Has Been Carrieid Out With Alarko AS. • A/c Engine Workshop (1.900 m2)A/c Corrosion Control / NDI Hangar (980m2) • A/c Fuel Systems Inspection Facility (732m2)
-
Afyon-Eskisehir Airfield JFAI Renovation - NATO
Emergency Generator • Jet Fuel Storage and Distribution Facilities • Mechanical and Electrical Distribution Systems • 1.250m3 Storage Tank and Pump Building • Two Truck Loading Systems • Drainage Tank Restoration • 75 kva Spare Generator • Lightening Protection Systems
-
Cengiz Topel Military Airfield - NATO
Military Airport Runway and Taxi Route Lightning and Control Systems • Generator Building and Generator Installation • Flight Control Tower Renovation and Replacement of Solex Glasses • 1.500m2 Squadron Building • Engine Workshop • Vehicle Maintenance Workshop and Connecting Roads • 9.315m2 Concrete Pavement Works With 40kg/cm2 Pressured
-
Afyon Military Airfield Phase II - NATO
1.250m3 Concrete And Steel Lined Burried Jet Storage Tank • Semi - Hardened Buildings • 2 Bottom Truck Loading Stations With Pantographs, Pump Station 120m3 Capacity • Related Pipelines • Jet Fuel Truck Shelters • Liquid Oxygen Storage Facility (1.500lt/3,5g/cm2) • Storage Buildings • 2.500m2 Concrete Pavements With 40kg/cm
-
Akhisar - Antalya Squadron Shelters - NATO
Hardened Squadron Operations Facility With a Construction Area of 638m2 Consists of Toxic Free Area (TFA) Which is The Pressurized and Filtered Part of The Building • Contamination Control Area (CCA) • Airlocks and Mechanical Rooms • Building Contains A Blast Chamber With Blast Valves • Blast Doors • CB (chemical/biological) Filters • Water Storage/Sewage Tanks and a Standby Generator For A Closed-up Operation For At Least 7 Days With No Connection To The Outside World • Squadron Operations Facility is Protected Against The Effects Of The Following Weapons: 1000 Lb General Purpose Bomb (Detonation At 10 Feet),122mm Rocket (Direct Hit),120mm Mortar (Direct Hit), 500 Lb Napalm Bomb