DESCRIPTION :
Botaş – Hanak Compressor Station Construction Project > Filter and Cyclone Separators
- Natural Gas Compressor and Turbine Assembly
- Gas Filter Systems
- Cyclone Seperator and Filtre Seperator Area
- Oil Cooler
- Gas Metering System
- Fuel Gas Skid
- Air Compressor System
- Heating Piping Systems
- Electric and Automation Systems
- High Pressure Piping Works
- 42” 85 Bar Piping And Live Connections
- Cold Cutting
- Station Control Systems and ESD
- All Electrical Works
- FM 200
- UPS
- Cabling
- 906 Kva Gas Generator
- Fire and Gas Dedection Systems
- Site Enstrumentation
- Cooler Fans
- VDF Panels
- Steel Construction and All Site Construction
- Cathodic Protection
PROJECT DETAILS
GOVERNMENT: | BOTAŞ - Petroleum Pipeline Company / TURKEY |
---|---|
PROJECT NAME: | Hanak Compressor Station Construction Project |
WORK FEATURE: | Filter and Cyclone Separators |
COMPLETION DATE: | 2018 |