DESCRIPTION :
Underground Storage of Natural Gas in North Marmara & Degirmenkoy Gas Fields Extension Project ( Phase II) – “32” Bulgaria Natural Gas Hottap Operation” Building.
- Natural Gas Metering Facilities
- Glycol And Knock-out Drum Tanks
- Teg Regeneration
- Teg Contactor And Filter Seperator Systems
- Hot Flare And Cold Flare Engineering And Construction
- Gas Heater Systems
- Compressed Air Systems
- Anti-corrosion Methanol Injection Systems
- Natural Gas Automation Building
- Hot Tap Operation 20 Inch 2km Botas Pipe Line
- Fire Detection And Extinguishing Systems
- Heat Tracing Gas Detection Systems
- Ex-proof Electrical Panels
- 1000 Kva Natural Gas Generator Instalation
PROJE DETAYI
GOVERNMENT: | Turkish Petroleum A.O. |
---|---|
PROJECT NAME: | Underground Storage of Natural Gas in North Marmara & Degirmenkoy Gas Fields Extension Project ( Phase II) |
WORK FEATURE: | 32" Bulgaria Natural Gas Hottap Operation |
COMPLETION DATE: | 2015 |